Section 1 from Cisalak to Jagorawi was inaugurated on Friday, 27 January 2012,[3] which is 3.7 kilometres (2.3 mi) in length.
Section 2 from Cisalak to Beji (5.5 kilometers (3.42 mi)) was opened for public on Saturday, 28 September 2019.
[4] With the completion of the remaining 3.31 kilometers (2.05 mi) and 2.19 kilometers (1.36 mi) of section that spans from Beji to Cinere, the toll road was completely opened for public on Friday, 22 December 2023.
[5] Metro, long or medium distances from and to Depok can use this toll road, without passing Lenteng Agung and Pasar Minggu.
[6] The toll road is divided into three sections.