Since the water is impounded so it can be released when farmers need it, San Carlos Lake is often at a low level except in wet periods.
[5] Construction of the dam incurred opposition from the Apache tribe, who feared a violation of their treaty rights, according to an author writing for the Federal Writers' Project: A compromise was finally made with the Indians, and the tribal burial grounds and the old camp from which Geronimo started his bloody raids now lie deep under the waters of the reservoir.
It was proposed to disinter the bodies but the Apache vehemently objected to what they considered desecration of the dead, so a concrete slab was laid over the principal burial ground at a cost of $11,000.
[6]As part of the San Carlos Indian Irrigation Project (SCIIP), Coolidge Dam formerly generated electricity from a hydroelectric plant.
A diesel electric generating plant also run by the Project was built simultaneously and located on withdrawn land near the town of Coolidge.
[9] In 1988, the Bureau of Reclamation completed a study that concluded that the dam needed modifications to prevent a failure should a significant flood or an earthquake occur.
[10] ($84.9 million in 2023 dollars[1]) In January 1993, heavy rainfall (up to three times the normal amount) in Arizona filled San Carlos Lake, and the operators were forced to release excess water.
In addition, the weather pattern for the year caused higher than normal temperatures in areas that would typically remain under snow.
The force of the Gila River undermined and ultimately caused the failure of the north and south abutments of the bridge crossing at Attaway Road, upstream from Coolidge.
The elevation at the dam is about the same as the starting point, so the trip is not strictly a climb, but peaks about the middle of the distance and then descends again to about 2,600 ft.