Cricklewood Depot

Trains berthing in the stabling roads between services are cleaned and have their water tanks refilled.

[4] The North London Waste Authority operated Hendon transfer station,[5] which was located immediately behind the northern end of the site and accessed through the passenger sidings.

[6] The site last received binliner trains on the 31st of march 2021 and was handed back to Barnet Council on 13 December 2021.

[7] As of January 2025 is marked for demolition for the Brent cross town redevelopment , a new waste transfer station will be built on the other side of the midland mainline after the demolition works are complete , this new site will connect directly to the Dudding hill freight lines.

[8] Work has not started on this as of January 2025 This England rail transport related article is a stub.