Crookwell Wind Farm, located at Crookwell west of Goulburn, New South Wales, consists of eight 600 kW wind turbines giving a total capacity of 4.8 MW.
It was the first grid-connected wind farm in Australia when built by Pacific Power in 1998.
Phase two of the Crookwell Wind Farm, planned to have an installed capacity of 92 MW, is under construction since 2009.
[5] It is expected to generate 300 GWh of energy per year, at a corresponding capacity factor of 36%.
First generation started in August 2018, and reached full production in December 2018.