There were two small timber buildings on the platform: a lamp room, and a goods warehouse, essentially a lock-up shed.
In the yard were two sidings, reached via a single connection from the main running line.
There was a 5-ton hand crane and a short timber loading stage, but no facilities for coal (unlike many NER stations).
There was also a platelayers' hut and a wash house for the station master and family.
At the Birstwith end of the yard was a pair of brick semi-detached cottages of a standard NER design.