Deptford Bridge DLR station

[7] The station layout consists of two elevated side platforms which run roughly north–south over the A2 road and parallel to the River Ravensbourne.

The station was proposed in 1989 further north as 'Deptford Creek'[8] before an island platform in its current location was proposed in 1990[9] with lift access on both sides of the A2 - the design was changed to the current layout before construction, with lifts only on the south side.

The station was opened in 1999 as part of the southern extension from Island Gardens to Lewisham.

The station was largely reconstructed and considerably enhanced when it was extended to enable 3-car trains to call at it.

The typical off-peak service in trains per hour from Deptford Bridge is:[10] Additional services call at the station during the peak hours, increasing the service to up to 22 tph in each direction, with up to 8 tph during the peak hours running to and from Stratford instead of Bank.

Deptford Bridge DLR Station before the 3 car capacity programme.