CTC signalling was extended to Kubokawa in 1986, and the Tadotsu - Kotohira section was electrified the following year prior to the privatization of JNR.
However, the maximum speed of electric trains in this section is limited to 85 km/h due to the overhead catenary being a direct-line suspension system (similar to trams) as a result of a lack of funds during construction at the end of the JNR era.
The reasoning being the low return on investments due to the sharp decline in traffic south of Kotohira, and the many narrow tunnels making the installation of overhead wires difficult.
In a 2006 submission to the subcommittees of the Ministry of Land, Infrastructure, Transport and Tourism, JR Shikoku cited the electrification of the Kotohira - Kochi section as one of the desired long-term investments.
Nanpū (南風) limited express trains make 14 round-trips per day between Okayama and Kōchi, Nakamura, or Sukumo.
Shimanto (しまんと) limited expresses make five round trips per day between Takamatsu and Kōchi, Nakamura, or Sukumo.