[2] Construction on the line began in August 2017.
[3] Trial operation began on 29 October 2021.
The line runs from north to south, starting at the existing Dunhua railway station.
It has two intermediate stations, Dunhua South and Yongqing.
[2] This People's Republic of China rail-related article is a stub.