The system operates Bombardier Flexity Outlook and Škoda ForCity[2] low-floor articulated light-rail trams.
[citation needed] Construction began in August 2002 and operation of the first phase commenced on 24 December 2004 with a total length of 15 kilometers (9.3 mi)[3] and two main lines, Otogar–SSK and Opera–Osmangazi University.
[4] The EsTram network is designed to carry passengers at a top speed of 50 km/h (31 mph) in mixed traffic.
The Emek–71 Evler line was extended in 2019 to reach the city hospital.
This tram-, streetcar-, or light rail-related article is a stub.