[1] The 70 metre-wide (230 ft.) low-level concrete arched bridge has seven spans and supports two four-lane carriageways and walkways along both sides.
[1] The bridge was built to provide faster vehicular access between Marina Centre and the financial district of Shenton Way and to displace traffic from St Andrew's Road and Connaught Drive.
However, this also makes it subject to occasional road closures on special occasions, where the bridge closes to all road traffic to allow spectators and pedestrians to observe fireworks seen during the National Day celebrations, New Year's Eve and the Singapore Fireworks Celebrations.
The bridge also forms part of the Singapore Grand Prix's Marina Bay Street Circuit, which debuted on 28 September 2008, and therefore has to be completely closed for the duration of the racing weekend.
National Development Minister Khaw Boon Wan noted that the construction of such a bridge had been suggested by the late Mr Lee himself, during a 2004 visit to Marina Bay.