The production and management model closely follows that of the earlier Tornado fighter jet programme.
[5] According to these order levels the workshare split should have been 39/24/22/15 UK/Germany/Italy/Spain, however Germany was unwilling to give up such a large amount of work.
[5] In January 1996, after much negotiation between German and UK partners, a compromise was reached whereby Germany would purchase another 40 aircraft.
[5] The workshare split was 43% for EADS MAS in Germany and Spain; 37.5% BAE Systems in the UK; and 19.5% for Alenia in Italy.
[6] The maiden flight of the Eurofighter prototype took place in Bavaria on 27 March 1994, flown by DASA chief test pilot Peter Weger.
[7] On 9 December 2004, Eurofighter Typhoon IPA4 began three months of Cold Environmental Trials (CET) at the Vidsel Air Base in Sweden, the purpose of which was to verify the operational behaviour of the aircraft and its systems in temperatures between −25 and 31 °C.
[14] In spite of this reduced requirement, on 14 May 2009 British Prime Minister Gordon Brown confirmed the UK would move ahead with the third batch purchase.