Europipe I

Europipe I is a 670-kilometre-long (420 mi) natural gas pipeline from the North Sea to Continental Europe.

[1] On 20 April 1993, an agreement between Norway and Germany was concluded on the construction of Europipe.

The pipeline runs from the Draupner E riser platform in the North Sea to a receiving terminal at Dornum in Germany.

From Dornum a 48-kilometre-long (30 mi) land line runs to the metering station in Emden.

The diameter of pipeline is 40 inches (1,000 mm) and the capacity is 18 billion cubic metres per annum (640 billion cubic feet per annum) of natural gas.