Never before had a project of that size been managed and so the ENRP was created as an opportunity to gain perspective in the construction and operation of wetlands for nutrient removal.

Its primary goal was to reduce the levels of phosphorus entering Water Conservation Area 1 (WCA-1) and to offer critical data and insight into the design and operation of the much larger scale project to come.

[2] The South Florida Water Management District (SFWMD) conducted construction, research and monitoring of the project.

[1] Particular emergent plants such as cattails were employed for their ability to uptake phosphorus out of the water as a means of short term removal, as well as absorbing nutrients into dead plant matter and soil particles for long term removal.

[3] Information gained from the experiment allowed for SFWMD to both anticipate potential problems and ensure that optimized phosphorus retention results could be achieved by STA technology at a comparatively lower cost.