[1] It has a capacity of 39.64 megawatt (MW) and an annual output of 36.5 GWh.
The solar park was developed by the company Solarhybrid and built by conecon using 62,832 225-watt and 110,880 230-watt solar panels, both manufactured by Suntech.
The PV project was built on a former military airfield on 89 hectares (220 acres), and was completed in 10 weeks only.
This article about renewable energy plants is a stub.
You can help Wikipedia by expanding it.This article about a Germany power station is a stub.