Receiving the Defense Secretary's approval on 21 July, the Air Force directed the Corps of Engineers to proceed with construction.
As a GCI station, the squadron's role was to guide interceptor aircraft toward unidentified intruders picked up on the unit's radar scopes.
In addition to the main facility, Calumet operated the following AN/FPS-18 Gap Filler sites: Over the years, the equipment at the station was upgraded or modified to improve the efficiency and accuracy of the information gathered by the radars.
The Ground/Air Task Oriented Radar (GATR) site was retained until the Joint Surveillance System (JSS) switchover in 1984.
Assignments: This article incorporates public domain material from the Air Force Historical Research Agency