The Flower Pot Interchange is an elevated 802 metres (2,631 ft) dual carriageway in Ghana with an asphalt concrete surfacing.
It consists of a 140-meter ramp from Shiashie onto the viaduct towards Airport Hills, and an 80-meter ramp connecting the viaduct to the Motorway towards Tema.
[1] It was constructed by the Chinese Railway Engineering and commissioned by President Nana Akufo-Addo on 19 November 2024.
When the project ended up costing more than ¢1 billion, some MPs questioned the expense.
This Ghana-related article is a stub.