The lack of political and financial foresight also removed a historical recreational waterway and potential future revenue generator to the town of Grangemouth.
The highest section of the canal passes close to Kilsyth and it is fed there by an aqueduct which gathers water from (the purpose built) Birkenburn Reservoir in the Kilsyth Hills, stored in another purpose-built reservoir called Townhead near Banton, from where it feeds the canal via a feeder from the Shawend Burn near Craigmarloch.
The canal continues past Twechar, through Kirkintilloch and Bishopbriggs to the Maryhill area north of Glasgow city centre.
A branch to Port Dundas was built to secure the agreement and financial support of Glasgow merchants who feared losing business if the canal bypassed them completely.
This branch flows past Murano Street Student Village, halls of residence for the University of Glasgow.
"[1] Numerous supplementary acts of Parliament preceded this period, and more followed, but the key to unlocking the problem was some creativity, in which "the Barons of the Court of Exchequer in Scotland, are, out of the money arising from the sale of forfeited estates, directed to lend the Forth and Clyde Navigation Company the sum of £50,000, by which they were enabled to resume their labours, under the direction of Mr. Robert Whitworth, an engineer possessing a well earned reputation".
Its course is parallel with the Carron, and in nearly a westwardly direction, passing to the north of the town of Falkirk, and thence to Red Bridge, where it quits the county of Stirling, and enters a detached portion of the shire of Dumbarton.
Hence it passes to the south of Kilsyth, and runs along the south bank of the River Kelvin, and over the Luggie Water, by a fine stone aqueduct, at Kirkintilloch; it then approaches within little more than two miles [3 km] of the north-west quarter of the city of Glasgow, to which there is a branch communicating with the Monkland Canal at Port Dundas, near that city.
The remaining part of the line is in a westwardly direction, crossing the Kelvin River by a noble aqueduct, and thence to the Clyde, into which, after running parallel with it for some distance, it locks down at Bowling's Bay, near Dalmuir Burnfoot.
The summit level is sixteen miles [26 km] in length, and in the remainder of its course, there is a fall to low water, in the Clyde, at Bowling's Bay, of 156 feet [48 m], by nineteen locks.
To mark the opening a hogshead of water taken from the Forth was emptied into the Clyde at Bowling to symbolise the union of the eastern and western seas.
[4] The geologist James Hutton became very involved in the canal between 1767 and 1774; he contributed his geological knowledge, made extended site inspections, and acted both as a shareholder and as a member of the management committee.
[11] The Society's campaigning included a petition of over 30,000 signatures for the reopening of the canal, which was then put in place under the Millennium Link project which commenced work in 1999.