GHQ Line

It was therefore decided to build a static system of defensive lines around Britain, designed to compartmentalise the country and delay the Germans long enough for more mobile forces to counter-attack.

The "green" section of the GHQ Line ran from the northern end of the Taunton Stop Line near Highbridge in Somerset, along the River Brue, across the Mendips from Wells and following the railway from Masbury into the Wellow valley.

The green line continued to Avening then down the valley to Framilode, protecting the strategic areas of Bristol, Avonmouth, and Sharpness.

On the section of the line in Essex, between Great Chesterford and Canvey Island, the defences were made up of around 400 FW3 type concrete pillboxes, which were part of the British hardened field defences of World War II.

Well over 100 pillboxes still exist on this section in 2025, with around 40 highly visible FW3 Type 22, 24, 26, 27 and 28 boxes between the Rettendon Turnpike and Howe Green, mostly alongside the A130 road.

A FW3/22 type pillbox in Wiltshire, near the Kennet and Avon Canal