[4] According to the FERC website, the company total cost for pipeline operations in the 2022 fiscal year was $60,318, 949.
[5] Location The Garden Banks Gas Pipeline is located entirely within the Gulf of Mexico, extending from Garden Banks Block 128 to South Marsh Island Block 76,[6] and intersects with four existing pipelines to move gas onshore.
The Garden Banks 72 platform is a base for gathering deepwater production from the Garden Banks area, and acts as a junction platform connecting both the Cameron Highway Oil Pipeline and the Poseidon Oil Pipeline System.
[7] Garden Banks makes up just one component of the 26,000 miles of oil and gas pipelines on the Gulf of Mexico's seafloor.
The gas is drilled via the Auger tension leg platform [located in Garden Banks Block 428], which is owned by the Royal Dutch Shell company.