German submarine U-196 was a Type IXD2 U-boat of Nazi Germany's Kriegsmarine during World War II.
The submarine was laid down on 10 June 1941 at the AG Weser yard in Bremen, launched on 24 April 1942, and commissioned on 11 September 1942 under the command of Kapitänleutnant Eitel-Friedrich Kentrat.
The submarine was powered by two MAN M 9 V 40/46 supercharged four-stroke, nine-cylinder diesel engines plus two MWM RS34.5S six-cylinder four-stroke diesel engines for cruising, producing a total of 9,000 metric horsepower (6,620 kW; 8,880 shp) for use while surfaced, two Siemens-Schuckert 2 GU 345/34 double-acting electric motors producing a total of 1,000 shaft horsepower (1,010 PS; 750 kW) for use while submerged.
[3] Under Kentrat's command she completed the longest patrol made by a submarine during World War II, leaving Kiel on 13 March 1943, and returning to Bordeaux on 23 October 1943, spending 225 days at sea.
[1] During that time she sailed all the way around the coast of South Africa and sank two British merchant ships in the Indian Ocean.
[1] On 30 November, U-196 left Batavia (Java, in Indonesia), now commanded by Oberleutnant zur See Werner Striegler.