In December 1979, staggered by construction cost, Entergy (then called Middle South Utilities) stopped work on Unit 2.
In 2007, the U.S. Nuclear Regulatory Commission (NRC) issued an Early Site Permit (ESP) to Grand Gulf.
[6] In 2008, Entergy and NuStart submitted a Combined Construction and Operating License (COL) application for a potential new nuclear unit at the Grand Gulf.
The Nuclear Regulatory Commission's estimate of the risk each year of an earthquake intense enough to cause core damage to the reactor at Grand Gulf was 1 in 83,333, according to an NRC study published in August 2010.
[12][13] After heavy rains in late April 2011, workers were pumping standing water collected in the abandoned, never-completed Unit 2 turbine building into the Mississippi River.
[14][15][16] Tritium is a very low level beta emitter with an approximate half-life of 12.3 years and it cannot penetrate the outer dead layer of skin.