Joseph Farington (1747–1821) was commissioned by the Navy Board to paint a panoramic view of Chatham Dockyard (as part of a project to create a visual record of all six home yards) in 1785.
William Camden (1551–1623) described Chatham dockyard as ...stored for the finest fleet the sun ever beheld, and ready at a minute’s warning, built lately by our most gracious sovereign Elizabeth at great expense for the security of her subjects and the terror of her enemies, with a fort on the shore for its defence.
[4]Chatham's establishment as a naval dockyard was precipitated by the use of the Medway as a safe anchorage by the ships of what became (under King Henry VIII) England's permanent Royal Navy.
Careening took place on the river, according to a Privy Council instruction of 1550;[7] for more specialised repairs and maintenance, however, ships would have had to travel to one of the purpose-built royal dockyards (the nearest being those on the Thames: Deptford and Woolwich).
Therefore, rather than risk being constrained by wind, tide and draught on a journey upriver, ships would seek as often as possible to do running repairs and maintenance while at anchor, and would only travel to the dockyard when necessary.
[19] Seeking to alleviate this less-than-satisfactory situation, the Navy Board explored options for developing a shore facility with direct access from the open water of the Thames Estuary.
The escalating Anglo-Dutch wars forced their hand, however: several temporary buildings were hastily erected in Sheerness, at the mouth of the Medway, to enable ships to re-arm, re-victual and (if necessary) be repaired as quickly as possible.
[10] From the very start of the 18th century, however, Chatham began to be superseded in both size and importance, first by Portsmouth, then Plymouth, when the main naval enemy became France, and the Western approaches the chief theatre of operations.
Alongside the four dry docks it now had a total of six shipbuilding slips (equalling Deptford and outnumbering the other yards in this regard), albeit three of the six were under 150 ft (46 m) in length and suitable only for building smaller warships.
Additionally required were the blockmakers, caulkers, pitch-heaters, blacksmiths, joiners and carpenters, sail makers, riggers, and ropemakers (274), as well as bricklayers, labourers and others.
[21] Building works at Chatham did not compare with the substantial expansions underway at Portsmouth and Plymouth at this time; but the southern part of the yard was significantly redeveloped, with construction of two new storehouses on Anchor Wharf and a major reconfiguration of the ropery.
The first steam-powered ship to be laid down at Chatham was HMS Phoenix, one of four paddle steamers built concurrently across the royal dockyards in the early 1830s, each designed by a different leading shipwright.
Following the success of such early trials with screw propulsion, several older sailing ships were taken into dry dock and retro-fitted with propellers, beginning with HMS Horatio.
[24] By 1861, No.1 Dock had been filled in and a machine shop constructed in its place for heating, bending and planing armour plate for HMS Achilles which was being built alongside.
When Achilles, for example, had been completed and floated out of dry dock, she spent almost a year moored in Gillingham Reach, where not only her engines, boilers, funnels and a 2.5-long-ton (2.54 t) propeller were fitted, but also masts, sails, rigging, guns, coal, food, ammunition and furnishings were either loaded or installed.
Two years later the project was largely complete, with facilities provided alongside for gun mounting and mast rigging, as well as a victualling depot and a coaling area.
Proposals were made for a fourth Basin of 57 acres (230,000 m2), together with additional large docks of up to 800 ft (240 m), to cover the remaining land on St Mary's Island; but these were soon superseded by plans to build an entirely new dockyard at Rosyth.
[35] During World War I, twelve submarines were built here, but when hostilities ceased, uncompleted boats were scrapped and five years passed before a further ship was launched.
[36] Production ramped up during World War II with HMS's Umpire, Una, Splendid, Sportsman, Shalimar, Tradewind, Trenchant, Turpin, Thermopylae and Acheron being constructed.
[39] Redundancy notices were served, but then abruptly withdrawn following the 1982 invasion of the Falkland Islands; the dockyard was heavily involved in preparing ships for the South Atlantic, and in repairing damaged vessels on their return.
Under its remit, the westernmost (No.1) Basin was turned into a marina, part of the former factory area to the south was transformed into an entertainment and retail complex ('Chatham Maritime') and the former Barracks (HMS Pembroke) became Universities at Medway.
[48] Chatham Dockyard has become a popular location for filming, due to its varied and interesting areas such as the cobbled streets, church and over 100 buildings dating from the Georgian and Victorian periods.
Productions that have chosen to film at Chatham Dockyard include: Les Misérables,[49] Call the Midwife,[50] Mr Selfridge,[51] Sherlock Holmes: A Game of Shadows,[52] Oliver Twist,[53] The World Is Not Enough [54] and Grantchester.
The yard would have received, stored and issued cannons and gun-carriages (along with projectiles, accoutrements and also all manner of small arms) for ships based in the Medway, as well as for local artillery emplacements and for army use.
In 1717 the original Storehouse was replaced with the Grand Store (a much larger three-storey building, contemporary with and of a similar style to, the Main Gatehouse in the Dockyard).
[126] During the wars with Spain it was usual for ships to anchor at Chatham in reserve; consequently John Hawkins threw a massive chain across the River Medway for extra defence in 1585.
In the event, those defences were built in distinct phases, as the government saw the increasing threat of invasion:[128] The Dockyard led to large numbers of military personnel being garrisoned in Chatham and the surrounding area.
The barracks for other ranks were arranged in three rows, west of the parade ground, with soldiers sleeping sixteen to a room in eight double beds, as was standard practice at that time.
This role ceased in 1801, however, when the entire Depôt establishment moved to Parkhurst Barracks on the Isle of Wight (where the recruits were less prone to find ways of deserting).
A further 3,000 troops could be accommodated in times of "total emergency" (900 were sleeping in the Drill Hall when it suffered a direct hit from two bombs in September 1917, which killed over 130 men).