[1] Latona was ordered on 23 December 1938 and was laid down at the yards of John I. Thornycroft & Company, of Woolston, Hampshire on 4 April 1939.
She was commissioned on 4 May 1941 but never served in her intended primary role, instead being used in the Mediterranean to deliver stores and supplies to the allied armies and garrisons at Tobruk and Cyprus.
[2] On being commissioned Latona sailed to Scapa Flow to embark stores and extra Oerlikon 20 mm cannons for defence against air attacks.
[2] Having completed loading, she sailed for the Mediterranean on 16 May, travelling via the Cape of Good Hope and the Red Sea.
Latona, carrying 1,000 Polish troops, was hit in the engine room by a bomb from a Junkers Ju 87 of I./StG1.