HVDC Zhoushan

[1] Construction started on Zhoushan HVDC in 1984 and completed in 1986.

[2] The static inverters are equipped with thyristors and designed for a voltage of 200 kV and a maximum transmission rate of 50 MW.

The inverters are the six-pole type, giving the station more extended harmonic filters than others.

The reactive power of the used harmonics filters is 23.5 MVAr at Ningbo station and 24.5 MVar at Gao Tongge station on Zhoushan.

The smoothing reactor has an inductance of 1.27 H. The inverter plants are: