[7] The original Tokaido Shinkansen, connecting Tokyo, Nagoya, and Osaka, three of Japan's largest cities, is one of the world's busiest high-speed rail lines.
Among the key people credited with the construction of the first Shinkansen are Hideo Shima, the Chief Engineer, and Shinji Sogō, the first President of Japanese National Railways (JNR) who managed to persuade politicians to back the plan.
[15] The popular English name bullet train is a literal translation of the Japanese term dangan ressha (弾丸列車), a nickname given to the project while it was initially discussed in the 1930s.
The Shinkansen name was first formally used in 1940 for a proposed standard-gauge passenger and freight line between Tokyo and Shimonoseki that would have used steam and electric locomotives with a top speed of 200 km/h (120 mph).
[16] Following the end of World War II, high-speed rail was forgotten for several years while traffic of passengers and freight steadily increased on the conventional Tōkaidō Main Line along with the reconstruction of Japanese industry and economy.
It enabled day trips between Tokyo and Osaka, the two largest metropolises in Japan, significantly changed the style of business and life of the Japanese people, and increased new traffic demand.
[27] Prime Minister Kakuei Tanaka was an ardent supporter of the Shinkansen, and his government proposed an extensive network paralleling most existing trunk lines.
Many other planned lines were delayed or scrapped entirely as JNR slid into debt throughout the late 1970s, largely because of the high cost of building the Shinkansen network.
Shinkansen trains are electric multiple units (EMUs), offering fast acceleration, deceleration and reduced damage to the track because of the use of lighter vehicles compared to locomotives or power cars.
JR Central called the plan "unrealistic" due to tight train schedules on the existing line, but reports said that Maehara wished to continue discussions on the idea.
[63] On 23 January 2024, a massive power outage struck the Tohoku, Hokuriku and Joetsu Shinkansen lines, resulting in the cancellation of 283 trains and affecting about 120,000 passengers.
[67] The resultant time savings alone from switching from a conventional to a high-speed network have been estimated at 400 million hours, and the system has an economic contribution of ¥500 billion per year.
[67] Following privatization, the JR group of companies have continued Shinkansen network expansion to less populated areas, but with far more flexibility to spin-off unprofitable railways or cut costs than in JNR days.
An important factor is the post bubble zero interest-rate policy that allows JR to borrow huge sums of capital without significant concern regarding repayment timing.
The Tōkaidō Shinkansen often experiences heavy snow in the area around Maibara Station between December and February, requiring trains to reduce speed thus disrupting the timetable.
Nevertheless, China's share is increasing fast, as close to 9.5 billion passengers in that nation have been served by the end of 2018 and is projected to pass Japan's cumulative numbers by as early as 2020.
Extensive trials using the Fastech 360 test trains have shown that operation at 360 km/h (224 mph) is not feasible because of problems of noise pollution (particularly tunnel boom), overhead wire wear, and braking distances.
On 28 October 2020, JR Kyushu announced it would utilize a 6-car version of the N700S for the isolated Shinkansen section from Nagasaki, with 'cross platform' change to a relay service at Takeo Onsen station to connect to Hakata.
The maximum speed on these lines is 130 km/h (81 mph), however the overall travel time to/from Tokyo is improved due to the elimination of the need for passengers to change trains at Fukushima and Morioka respectively.
Construction of a Base tunnel on the Yamagata Shinkansen is proposed, with JR East having undertaken a survey of a planned route from Niwasaka to Sekine, just south of Yonezawa station.
The third set was undertaking gauge changing trials at Shin-Yatsushiro Station (on Kyushu), commencing in 2014 for a proposed three-year period, however testing was suspended in December 2014 after accumulating approximating 33,000 km (21,000 mi), following the discovery of defective thrust bearing oil seals on the bogies.
Compared with air transport, the Shinkansen has several advantages, including scheduling frequency and flexibility, punctual operation, comfortable seats, lower carbon emissions, and convenient city-centre terminals.
One study done in 2016 concluded that the Tohoku Shinkansen between Tokyo and Aomori had substantially fewer days with delays longer than 30 minutes compared to air travel.
[104][better source needed] Class 801 forty two EMUs were built by Hitachi for London North Eastern Railway, branded as the Azuma, they operate at a maximum speed of 125 mph (200 km/h).
[108] The sets are to incorporate design changes such as the modification of air conditioning system, in order to operate efficiently at temperatures up to 50 degrees Celsius, larger capacity particulate filters, and increased large luggage spaces.
[citation needed] The U.S. Federal Railroad Administration was in talks with a number of countries concerning high-speed rail, notably Japan, France and Spain.
[120] Japan had promoted its Shinkansen technology to the Government of Brazil for use on the once planned high-speed rail set to link Rio de Janeiro, São Paulo and Campinas.
[121] On 14 November 2008, Japanese Deputy Prime Minister Tarō Asō and Brazilian President Luiz Inácio Lula da Silva talked about this rail project.
Vietnam Railways was considering the use of Shinkansen technology for high-speed rail between the capital Hanoi and the southern commercial hub of Ho Chi Minh City, according to the Nihon Keizai Shimbun, citing an interview with Chief Executive Officer Nguyen Huu Bang.
Vietnam hoped to launch high-speed trains by 2020 and planned to start by building three sections, including a 90 km (56 mi) stretch between the central coastal cities of Da Nang and Huế, seen as potentially most profitable.