The previous building High Tunstall School consisted of five main blocks ( A-B-C-D-E).
The school also has a 20M x 5M swimming pool, a running track and several fields used mainly for Physical Education lessons.
The new High Tunstall School (in use since September 2019) is based in one main building made up of three floors.
The bottom floor is where the dining hall and administration area is (as well as the ARC which caters to students with special needs).
This start of year achievement would leave High Tunstall above average for both the Hartlepool LEA and England.