Hsieh-ho Power Plant

The Hsieh-ho Power Plant (traditional Chinese: 協和發電廠; simplified Chinese: 协和发电厂; pinyin: Xiéhé Fādiànchǎng) is an oil-fired power plant in Zhongshan District, Keelung, Taiwan.

The power plant started its operation after the commissioning of its first generation unit in January 1977.

The third 500-MW unit was finished on 19 December 1979 after a record-breaking construction period of 26 months.

[5] The steam generator is rated at 1,701 tonne/hour, 176 kg/cm2 and 542 °C at superheater outlet and reheat to 542 °C.

Hsieh-ho Power Plant is accessible North from Keelung Station of Taiwan Railways.