The Sun Ba Power Plant or Fong Der Power Plant (traditional Chinese: 森霸電廠; simplified Chinese: 森霸电厂; pinyin: Sēnbà Diànchǎng) is a combined cycle gas-fired power plant in Shanshang District, Tainan, Taiwan.
[1][2] The installed capacity of the power plant is 980 MW.
[3][4] The power plant was commissioned on 29 March 2004.
It has an IPP agreement with Taiwan Power Company for 25 years.
This article about a power plant in Taiwan is a stub.