[1] The baseline 220 MWe design was developed from the CANDU based RAPS-1 and RAPS-2 reactors built at Rawatbhata, Rajasthan.
India took help of Soviet Union whose VVER (Pressurised Water Reactor type) technology was used as a design for indigenization by Bhabha Atomic Research Centre in partnership with Indian manufacturers Larsen & Toubro and Bharat Heavy Electricals Limited.
MAPS-1&2 design was evolved from RAPS-1&2, with modifications carried out to suit the coastal location and also introduction of suppression pool to limit containment peak pressure under loss of coolant accident (LOCA) in lieu of dousing tanks in RAPS-1&2.
The major improvements in these designs include valve-less primary heat transport system and a unitized control room concept.
The 700 MWe PHWR design includes some features, which are introduced for the first time in Indian PHWRs which include partial boiling at the coolant channel outlet, interleaving of primary heat transport system feeders, passive decay heat removal system, regional over power protection, containment spray system, mobile fuel transfer machine, and a steel liner on the inner containment wall.
[4] By 2031–2032, NPCIL plans to construct 18 more nuclear power reactors, which together have the potential to produce 13,800 MWe of electricity.