Industrikraft Midt-Norge is a Norwegian energy company that holds a permit to build a thermal power plant fueled primarily by natural gas from Haltenbanken, but also partially from biofuel, at the Fiborgtangen industrial site in Levanger Municipality, Norway.
The company is owned by Nord-Trøndelag Elektrisitetsverk, Trondheim Energi, Norske Skog and Statoil.
The planned power plant would involve two generators producing a total of 800 megawatts (1,100,000 hp) of electricity, that would give an annual production of 6.4 terawatt-hours (23 PJ).
About 0.2 terawatt-hours (0.72 PJ) of this is to be used as steam to power the paper mill Norske Skog Skogn that is collocated at Fiborgtangen.
A construction of the plant would require a gas pipe to be built from the landing site at Tjeldbergodden in Møre og Romsdal up though Trondheimsfjord to Fiborgtangen.