KAI Commuter Bogor Line

Note: Bold text indicates trainsoriginate or terminate at that station.

Until May 2022, the elevated tracks and stations between Jakarta Kota and Manggarai are shared with the Cikarang Line, whereas the ground tracks and stations between Manggarai and Bogor are shared with the Loop Line.

Before the renaming, it was named as the Central Line with the abbreviation (C) on system maps until May 2022.

In February 2021, a tender for feasibility study for Bogor–Lido (near Cigombong station) track electrification was announced by Jabodetabek Transportation Authority on the ministry's e-procurement website.

[3][4] In May 2021, a regional office of the ministry posted an update to existing Bogor–Sukabumi double-tracking project, mentioning the possibility of KRL Commuterline extension to Sukabumi.

Two 205 series trains at Bogor Station.