The Kangy Angy Maintenance Centre is a railway depot at Kangy Angy on the Central Coast, New South Wales to maintain the NSW TrainLink D sets.
The depot is almost 500,000 square metres (5,400,000 sq ft) in size and has about 6 kilometres (3.7 mi) of electric rail lines.
It runs 24/7 and is operated by UGL Rail under a 15-year contract.
In 2017, Transport for NSW awarded a contract to John Holland to build a new depot adjacent to the Main Northern line at Kangy Angy to maintain the NSW TrainLink D sets.
[2][3] Major construction was completed in 2020 and the first D set arrived at the facility in October 2020.