Kepong Sentral Komuter station

It is part of the Tanjung Malim–Port Klang Line, and also provides KTM ETS services.

Situated just beside this station is the Kuala Lumpur Middle Ring Road 2 (MRR2).

The station was built as an infill station which opened in July 2006. intercity services were extended to this station in 2008 when it was included in the KL Sentral-Ipoh shuttle, which was discontinued when Electric Train Service began operations in August 2010.

The Kepong Komuter station, which also serves the same locality is located 1 km away.

This station serves as an interchange to the Putrajaya line via a link bridge.

Concourse, 2023.