Kuwait International Airport

The current main airport structure, designed by Kenzo Tange and opened in 1979, was executed and completed by Al Hani Construction in a joint venture with Ballast Nedam of The Netherlands.

[citation needed] In 2011, the Department of Civil Aviation announced the intention of extending Kuwait International Airport so it can handle more passengers and more aircraft.

On May 20, 2013, the Director of Operations Management in the General Administration of Civil Aviation, Essam Al-Zamil, announced that some of the flights will be diverted to the Sheikh Saad Terminal instead of Kuwait Airport's main terminal starting in July due to the large number of passengers and the growing number of aircraft attributing to Kuwait Airport being over capacity.

[citation needed] There are 2,450 additional car parking spaces in a dedicated surface lot adjacent to the terminal and connected to the building by a bridge.

Terminal 2, designed by Foster and Partners, will expand the airport's overall capacity by 25–50 million passengers per year through the introduction of a triangular building with 28 gates, 4,500 additional parking spaces and a 400-bed air-side hotel.

The building was designed by the Spanish branch of the American company AECOM and built by a joint venture between Cengiz Insaat and First Kuwaiti Contractor.

It is housed in a dedicated building neighboring the cargo-handling facilities on the airport compound and built over an area of 55,000 square meters.

Attached to Terminal 1 but with dedicated entrance/exit points, it also includes check-in zones, security checkpoints, lounges, shops, three departure gates, customs and arrival belts.

The following airlines offer scheduled passenger services:[14] Media related to Kuwait International Airport at Wikimedia Commons

Inside the airport's Terminal 1
Terminal 1's departures area