The late nineteenth century was a troubled period for the LSWR due to frequent motive power shortages brought about by employing a collection of ageing locomotives in an era of increasing rail traffic.
There was a need to supplement this fleet with a new class of locomotive design that could undertake the mundane task of shunting in goods yards around the LSWR network.
[2][page needed] A new class of yard shunters was required to supplement the railway's current stock of 0-6-0Ts, which dated from 1881 and had been constructed by Beyer, Peacock and Company.
[2][page needed] Very few modifications were undertaken during their working careers, with only the Adams stovepipe chimney being replaced by a Drummond lipped example, whilst vacuum brakes were also eventually implemented.
The G6 Class was a highly localised, though useful, locomotive design that very rarely ventured off the LSWR network, even in service with the Southern Railway.
The only exception was the transfer of a single example to Reading freight yard in 1941 to assist with the GWR's shortage of motive power during the Second World War.
[3][page needed] After Nationalisation, two members of the class eventually found their way into departmental service, both being allocated to Meldon Quarry in Devon.