Line 10 of the Chengdu Metro (simplified Chinese: 成都地铁10号线; traditional Chinese: 成都地鐵10號線; pinyin: Chéngdū Dìtiě Shí Hào Xiàn) runs from Taipingyuan in Wuhou to Xinping in Xinjin.
Currently, the line is 37.972 km (23.6 mi) long.
[4] Phase I of Line 10 began construction in July 2014 and opened in September 2017.
Phase II began construction in 2016[5] and opened on December 27, 2019.
[6] It is the first line in Chengdu Metro to use 6-car Type A rolling stock for service.