Chengdu BRT

[1] The line began a free trial run on May 31, 2013, and started official operation on June 11, 2013.

It has 29 center platform stations located in expressway median which requires special buses with the doors on the left.

A new 7.8 km (4.8 mi) radial line heading northeast from the BRT loop to Qingbaijiang District is under construction.

[3] The line, called the Fenghuang Shan (Phoenix Mountain) BRT, is scheduled to open in 2017.

[6] Additional BRT lines are planned to radiate from the loop with lines heading west to Wenjiang District, east via Shanbanqiao Road, and south to Tianfu New Area.