Line 4 of Foshan Metro (FMetro) (Chinese: 佛山地铁4号线; pinyin: Fóshān Dìtiě Sì Hào Xiàn) is a line under construction in Foshan.
The first phase of the line will run in an L-shaped northwest-east direction, connecting Beijiang Dadao in Sanshui District with Gangkou Lu in Nanhai District, with 33 stations and 55.2 km (34.3 mi) kilometers of track.
[1][2] Construction started on 15 January 2022.
[3][4][5] The line is expected to operate 6 car type B trains with a maximum speed of 100km/h, and will be fully automated and driverless.
[6]