She is the first of seven 400,000-ton very large ore carriers (VLOC) ordered by Vale from Daewoo Shipbuilding & Marine Engineering in South Korea and twelve from Jiangsu Rongsheng Heavy Industries in China, which are designed to carry iron ore from Brazil to Asia along the Cape route around South Africa.
[1] Ore Brasil has seven cargo holds with a combined gross volume of 219,980 cubic metres and net tonnage of 67,993.
[1] The main engine, which has a maximum output of 29,260 kilowatts (39,240 hp) at 78 rpm, burns 96.7 tons of heavy fuel oil per day.
[13] On 24 May 2011 Vale Brasil received her first cargo at the Brazilian port Terminal Marítimo de Ponta da Madeira — 391,000 tons of iron ore, enough to produce steel for more than three Golden Gate bridges, bound for Dalian in China.
[14] However, in June, after rounding the Cape of Good Hope, the ship was rerouted to Taranto, Italy, and turned back towards the Atlantic Ocean.
This alluded that Valemax ships bound to Chinese ports are simply not being loaded to maximum capacity - and with no change in their physical dimensions.