MV Cuthred

MV Cuthred was built by Richards of Lowestoft for British Rail (later Sealink) at a cost of £275,000 (equivalent to about £5,717,000 in 2023).

With a gross tonnage of 704, she was the largest Isle of Wight Ferry of the time, capable of carrying 48 cars and 400 passengers.

[3] Her design was unique, but formed the basis for the three sisters, MV Cenred, Cenwulf and Caedmon, built in 1973.

[4] Propulsion was by means of two Voith Schneider cycloidal propellers mounted on diagonally opposite corners of the hull, each one being driven by a Paxman 8RPHCM turbocharged V8 diesel engine of 378 bhp (282 kW) at 900rpm.

[5] She remains laid up near Setubal to this day, slowly decaying, just a couple of miles from the route she served for almost 19 years.