It is situated 16 kilometres from Banswara town in Banswara district Rajasthan, India.
[1] The dam was constructed between 1972 and 1983 for the purposes of hydroelectric power generation and water supply.
[2][3] It is the biggest multipurpose project for tribal area of Rajasthan.
The dam has an installed capacity of 140 MW.
This article about a dam, floodgate or canal in India is a stub.