[4] The dam project was begun in 1949 and completed in 1955. foundation stone for the project was laid on 27 March 1949, by the then Public Works Minister of Madras State, Sri M. Bhaktavatsalam as Palakkad was a part of the Madras Presidency during those times.
The dam was constructed in record time, and on 9 October 1955, the then Chief Minister of Madras State, Thiru.
The total catchment area is 147.63 square kilometres,[5] and the reservoir has a capacity of 226 million cubic meters [5] of water.
The canal systems serve to irrigate farmland while the reservoir provides drinking water to Paladin and surrounding villages.
Attractions: Dam, amusement park, boating facilities, rock garden and ropeway.