Merowe Dam

The powerhouse is equipped with ten 125 megawatts (168,000 hp) Francis turbines, each one designed for a nominal discharge rate of 300 cubic metres per second, and each one driving a 150 MVA, 15 kV synchronous generator.

To utilize the extra generation capacity, the Sudanese power grid will be upgraded and extended as part of the project, with about 500 kilometres (310 mi) of new 500 kV aerial transmission line across the Bayudah Desert to Atbara, continuing to Omdurman/Khartoum, as well as about 1,000 kilometres (620 mi) of 220 kV lines eastwards to Port Sudan and westwards along the Nile, connecting to Merowe, Dabba and Dongola.

The following decade saw international industry and planning offices busy, producing a total of four feasibility studies [1 - Coyne et Bellier, 1979 / Gibb, Merz & McLellan, GB, 1983 / Sweco, SE, 1984 / Monenco Consultants Ltd., CA, 1989].

A greatly improved creditworthiness brought an influx of foreign investment, and the contracts for the construction of what is now known as the Merowe Dam project were signed in 2002 and 2003.

The main contractors are: By the time the contracts were signed, the Merowe Dam had been the largest international project the Chinese industry ever participated in.

The left river channel was closed on 30 December 2005; the project timeline scheduled the reservoir impounding to start in mid-2006 and the first generating unit to go on-line in mid-2007.

[5] The capital Khartoum and a few large plantations account for more than two thirds of the country's electric power demand, while most of the rural areas are not connected to the national grid.

The two main facilities, the Sennar (constructed in 1925) and Roseires (1966) dams on the Blue Nile, were originally designed for irrigation purposes rather than power production.

Large investments into the medium and low voltage distribution grids will be necessary but not sufficient to reach this ambitious goal: First and foremost, the foreseeable increase in power consumption would require the addition of generating capacity.

[citation needed] Before the construction began, an estimated 55,000 to 70,000 people were resident in the area covered by the reservoir lake, mainly belonging to the Manasir, Hamadab and Amri tribes.

[6] At the resettlement sites, farmers received plots of land relative in size to their former possessions, in addition to financial compensation for lost assets—houses and date palms.

[6] Though government officials claim there are improved living conditions at the resettlement areas, with relatively modern buildings and infrastructure, affected people reject the compensation plans.

Kothari stated he has "received reports that the Merowe reservoir’s water levels have already risen, destroying dozens of homes in the area and putting many more at risk.

"[11] Kothari announced, "The affected people have claimed that they received no warning that water levels would be raised and that no assistance from Government authorities has been forthcoming since their houses were destroyed."

"[11] Kothari called upon the Sudanese government to ensure safety and adequate housing to all those affected by the dams and warned the projects "would lead to large-scale forced evictions and further violence."

The section between the 4th and 5th cataract—a significant portion of which will be inundated by the reservoir lake—has been densely populated through nearly all periods of (pre)history, but very little archaeological work has ever been conducted in this particular region.

[6] Historian Runoko Rashidi issued a statement in solidarity with Sudanese Nubians protesting the dams and called for a halt to their construction.

As Sudan now pushes forward to make use of its water allotment, those countries have begun to call for a revision of the treaty, arguing that—with the exception of Ethiopia—they had all been under colonial rule at the time the negotiations took place, and had not been represented in their best interest.

More recently, unrest in Nubia as a direct result of the dams and the forced permanent displacement of Nubians from their homelands threatens to erupt into war.

A group calling itself the Nubian Liberation Front is threatening armed resistance in order to thwart the series of dams along the Nile, and particularly at Kajbar.

Astronaut photograph of Merowe Dam
During relocation of the Manasir from Dar al-Manasir ahead of the flooding their villages were destroyed and compensated palm trees were burned