Middle Dnieper Hydroelectric Station

The Middle Dnieper Hydroelectric Station is a run-of-river power plant on the Dnieper River in Kamianske, Ukraine, operated by Ukrhydroenergo.

[1] The primary purpose of the dam is hydroelectric power generation and navigation.

It is the fourth dam in the Dnieper cascade.

The dam has an associated lock and a power station with an installed capacity of 352 MW.

Construction on the dam began in 1956 and the last generator was commissioned in 1964.