The stop consists of twin platforms accessible by ramps at either end.
The track layout allows two trams to travel between the stations at the same time.
Work laying the new track and installing the new OHLE (over head line) cables began in spring 2012.
The job took about three months to complete, and 18 test tram runs passed successfully before opening.
[5] Free interchange for journeys made within an hour is available between trams and buses as part of Transport for London's Hopper Fare.