Mtera Dam

The travel time from Dodoma is about two hours on a tarmac road.

It measures 660 square kilometres (250 sq mi) at full capacity.

It was built from 1975 to 1979 for the purpose of regulating water level at the downstream at the Ruaha installed Kidatu Hydro-electric Dam.

The lake is considered to be one of the best places in Tanzania to observe birds, since there are approximately one million dead trees in it and it has many shallow areas.

[3] Öhman, May-Britt, Taming Exotic Beauties: Swedish Hydro Power Constructions in Tanzania in the Era of Development Assistance, 1960s - 1990s, Stockholm, 2007, PhD Thesis, http://www.diva-portal.org/smash/record.jsf?pid=diva2:12267