[2] The farm consists of 56 Vestas V90-3MW wind turbines, with a generating capacity of 168 MW.
The energy output from the Musselroe Wind Farm will be sufficient to supply electricity to around 50,000 households and abate 450,000 tonnes of CO2 emissions annually.
[3] The first 37 turbines were connected to the grid in 2013,[4][5] and the full farm was completed in January 2014.
Grid connection started in March 2013, and was fully commissioned during September 2013.
Note: From 2018, the wind farm participated in the FCAS market; this generally reduces the amount of power provided to the grid in order to allow a ramp up when required.