Under the project by Gujarat Urban Development Corporation, treated sewage water was to be drained in the lake.
But the sewage water was drained untreated in the lake.
[2] In January 2019, the Mehsana Municipality appointed a consultant to prepare a detailed project report (DPR) for the development of the lake.
The DPR proposed a cost of ₹11.99 crore (US$1.4 million) for the project.
[1] The preliminary development proposal includes a cordon wall, a garden and a children's park along with a storm water drainage system for the lake.