Nagarjuna Sagar tail pond

700 MW peaking power for eight hours duration can be met from the one Tmcft of live storage water capacity available in the tail pond.

200 Tmcft surplus water annually from the Godavari River is planned to be fed into this tail pond by the Dummugudem Lift Irrigation Scheme which is under execution.

Dummugudem to Nagarjuna Sagar tail pond link canal is entirely located in Telangana region and needs to be routed through high lands which necessitate more pumping head.

[4] An alternative link canal to Nagarjuna Sagar tail pond from Polavaram dam is also economically feasible to transfer Godavari water.

The Rajolibanda barrage is not receiving adequate continuous flows due to excessive water utilization in its catchment area in Karnataka.

Thus Nagarjuna Sagar tail pond will play pivotal role to put to use the water from the Godavari River in all regions of the Andhra Pradesh state.

810 MW peaking power station at the toe of Nagarjuna Sagar dam