Pulichinthala Project

[3][4] It is a crucial irrigation facility for farmers in four coastal districts: West Godavari, Krishna, Guntur, Palanadu, and Prakasam, covering over 13 lakh acres.

[13] It has a 30 Tmcft live storage capacity to impound river floodwaters generated from the catchment area located downstream of Nagarjuna Sagar Tail Pond.

The project reservoir provides a water supply to the downstream Prakasam Barrage that then can be sent out through the Pattiseema lift/Polavaram irrigation canal during monsoon months.

[citation needed] The Godavari Penna River linking project was constructed to stabilize the existing irrigated area under the Nagarjuna Sagar right canal.

[clarification needed] With FRL 25M the newly created Vykuntapuram Barrage pond will have backwaters beyond Pokkunuru up to the toe of the Pulichinthala Project.

Dr. KL Rao Sagar Pulichinthala Project entrance
Project entrance